Fiji- Brewery
This prefabricated steel brewery building was completed in Fiji in 2024. The building measures 120 m × 80 m × 9 m, and its structural design is calculated for a wind load of 1.8 kN/m², matching the island's exposure to tropical weather.
The main frame adopts hot-rolled H-steel, and all steel members are hot-dip galvanized to provide long-term anti-corrosion protection against the island's high humidity and marine salt atmosphere. Galvanized C250 purlins serve as secondary structural members, ensuring stable support for the roof and wall cladding while effectively transferring loads to the main steel frame.
The building envelope uses 0.5 mm PPGI corrugated sheets for both the roof and the walls, offering good weather resistance and a clean, bright industrial appearance. A stainless steel gutter system is installed to guarantee smooth rainwater drainage.
All steel components were prefabricated and hot-dip galvanized at the factory and shipped in 7 × 40HQ containers for rapid on-site assembly. This steel frame brewery provides a spacious, hygienic and durable production environment, well suited for brewing, bottling and associated process operations.
|
Fiji- Brewery |
|||||
|
Country |
Philippines |
Year |
2024 |
||
|
Project Information |
|||||
|
Project |
Brewery |
Dimension |
120mx80mx9m |
Wind speed |
1.8kn/m² |
|
Material |
H-steel |
Paint |
HDG |
Purline |
Galvanized C250 |
|
Roofing |
PPGI corrugated sheet, 0.5mm |
Wall |
PPGI corrugated sheet, 0.5mm |
Ceiling |
None |
|
Brick height |
None |
Gutter |
Stainless steel |
Containers |
7x40HQ |
|