Philippines - Three-story Apartment Frame
This three-storey steel apartment frame project was completed in the Philippines in 2023, with overall dimensions of 29.6m × 12.74m ×13.9m. The structural frame is engineered to resist extreme wind speed up to 250km/h, fully adapted to the local typhoon-prone climate of the Philippines.
H-steel is adopted as the main load-bearing structural material for this multi-storey residential frame. All steel members are coated with epoxy paint, which provides outstanding anti-corrosion and anti-rust performance to protect the steel frame under high humidity and coastal salt spray environment. C purlins are used as secondary supporting components to stabilize roof and floor systems and transfer loads evenly to primary steel beams and columns.
1mm floor decking plates are equipped for each floor, acting as permanent formwork and working together with concrete slabs to bear live loads from residential use. The integrated steel structure package includes steel stair frame, elevator shaft and supporting frame for elevator installation. The wall enclosure will be constructed by the client on-site after the delivery and erection of the steel frame.
All steel parts are prefabricated, cut, welded and painted in factory, then packed into 5×40HQ containers for sea transportation. This pre-engineered steel apartment frame delivers fast on-site assembly, excellent structural integrity and superior typhoon resistance. It is a reliable prefab steel solution for multi-storey residential apartment buildings in tropical coastal regions.
|
Philippines -Three-story Apartment Frame |
|||||
|
Country |
Philippines |
Year |
2023 |
||
|
Project Information |
|||||
|
Project |
Apartment frame |
Dimension |
29.6x12.74x13.9m(Three floors) |
Wind Speed |
250km/h |
|
Material |
H-steel |
Paint |
Epoxy paint |
Purline |
C purline |
|
Stair |
Included |
Elevator shaft |
Included |
Elevator |
Included |
|
Floor |
Floor decking plate 1mm |
Wall |
Client built |
Containers |
5x40HQ |
|
Project Pictures |
|||||