Tanzania - Limestone Powder Plant
This steel-framed process building was delivered to a limestone powder plant in Tanzania in 2025. The hall measures 60 m × 30 m, with an eaves height of 7 m and a ridge height of 13 m, and is engineered for wind speeds up to 90 km/h to suit the local site conditions.
The main frame adopts H-steel columns and rafters, forming a single-storey steel hall that accommodates milling and conveying equipment for limestone powder processing. Alkyd paint coats all steel members for anti-rust protection, and C purlins support the roof and wall cladding while transferring loads back to the main frame.
Both the roof and walls are clad with 0.5 mm PPGI single sheet, a lightweight, corrosion-resistant enclosure well matched to a dusty process environment. The uninterrupted cladding leaves the interior free for equipment layout and material flow.
All steelwork was prefabricated off-site and shipped in 4 × 40HQ containers for fast on-site erection. The result is a robust, adaptable process hall that supports crushing, milling and powder handling operations with clear space for machinery and future layout changes.
|
Tanzania - Limestone Powder Plant |
|||||
|
Country |
Tanzania |
Year |
2025 |
||
|
Project Information |
|||||
|
Project |
Limestone Powder Plant |
Dimension |
60m*30m*7(13)m |
Wind Speed |
90km/h |
|
Material |
H-steel |
Paint |
Alkyd paint |
Purline |
C purlin |
|
Roof |
PPGI single sheet, 0.5mm |
Wall |
PPGI single sheet, 0.5mm |
Containers |
4x40HQ |
|