Steel members are made in the factory and must travel to site. When a building needs members longer than a standard truck or container allows, the design must change - and buyers should know that before the drawings are frozen.
1. The limits you will meet
Standard containers: roughly 12 metres internal length, with width and height limits.
Flatbed and low-bed trucks: length limits set by local road rules, often around 13 to 18 metres.
Width and height limits for escorts and permits.
Weight limits at bridges and on local roads.
2. What happens when a member is too long
Options include:
Splitting the member into two or more pieces with a site-bolted joint.
Redesigning the frame to shorter modules.
Special transport with permits and escorts, at extra cost and delay.
Site assembly of shop-welded segments.
Each option has consequences for strength, cost and erection time.
3. Split joints need design
A split member is not simply two pieces bolted together. The joint needs a designed connection - end plates, bolts, sometimes a splice with web and flange plates. It must be detailed, fabricated and inspected like any other connection, and its position should avoid the point of maximum bending.
4. Transport affects the whole plan
Oversize loads move slowly, need permits and may be restricted to certain hours. If several oversize members are needed, the delivery schedule stretches. On remote sites, this can dominate the programme.
5. Design within transport where possible
Choosing a column grid and member lengths that fit standard transport is one of the cheapest decisions in the project. It reduces cost, simplifies delivery and makes the steel easier to re-use later.
6. What to ask
Do any members exceed standard transport limits?
If so, are they split, redesigned, or shipped oversize?
Where are the split joints, and are they designed?
What permits and escorts are needed, and who arranges them?
How does transport affect the delivery schedule?
In short: transport limits shape the design as surely as loads do. Keep members within standard limits where possible, design split joints properly where not, and plan the delivery schedule around the longest piece.